Long-range building-condition & reserve plan — Facility Condition Index (FCI), remaining useful life by system, and a 10-year renewal forecast that sizes the reserve. Figures are illustrative model data pending a formal facility-condition assessment.

27 building systems are past useful life network-wide — $9.91M of deferred renewal is the backlog that drives the Facility Condition Index.
Replacement value (CRV)
$100.49M
208 systems tracked
Network FCI
0.099
Fair
deferred ÷ replacement · lower is better
Systems past useful life
27
of 208 tracked
Deferred renewal backlog
$9.91M
needs renewal now
10-yr renewal need
$38.48M
$3.85M/yr level reserve
Recommended annual reserve
$3.85M/yr
levels the $38.48M 10-year forecast into a steady annual set-aside
Capital Renewal Fund · authorized
$1.80M
Reserve funded47% · $2.05M short/yr
The authorized fund is below the level reserve — the gap accrues as deferred renewal each year.

Renewal forecast · next 10 years

$38.48M total · systems land in the year they reach end of life
$9.91M
2026
$1.52M
2027
$2.35M
2028
$4.20M
2029
$2.54M
2030
$2.57M
2031
$4.55M
2032
$2.52M
2033
$3.17M
2034
$5.14M
2035
Amber bars exceed the $3.85M annual reserve — years where renewals outpace a level set-aside and lean on prior-year balance or financing.
CampusReplacement valueFCIPast lifeNext-5-yr renewalWorst system
LRA Coral Way
8 systems
$4.11M0.307 · Critical2$1.53MInterior / Finishes
critical · 7yr past · $410K
LRA Atlantic
8 systems
$3.67M0.232 · Poor2$1.33MInterior / Finishes
critical · 7yr past · $260K
LRA Heron Point
8 systems
$3.36M0.231 · Poor2$1.24MInterior / Finishes
critical · 6yr past · $235K
LRA Palmetto Middle High
8 systems
$3.61M0.217 · Poor2$1.02MHVAC
critical · 4yr past · $635K
Northstar High - North
8 systems
$4.41M0.204 · Poor1$1.54MHVAC
poor · 2yr past · $900K
LRA Oakmont Middle High
8 systems
$4.15M0.176 · Poor2$860KHVAC
critical · 4yr past · $370K
LRA Cypress
8 systems
$3.47M0.146 · Poor1$1.30MInterior / Finishes
poor · 3yr past · $505K
LRA Magnolia
8 systems
$3.81M0.126 · Poor2$480KSite / Parking
poor · 2yr past · $205K
LRA Fairway
8 systems
$4M0.120 · Poor1$480KInterior / Finishes
poor · 0yr past · $480K
LRA Citrus Grove
8 systems
$4.27M0.090 · Fair1$1.19MInterior / Finishes
critical · 4yr past · $385K
Harbor Light Academy
8 systems
$3.96M0.090 · Fair1$1.99MInterior / Finishes
poor · 3yr past · $355K
Northstar High - Westgate
8 systems
$4.07M0.081 · Fair1$1.85MInterior / Finishes
poor · 2yr past · $330K
LRA Oleta
8 systems
$3.76M0.080 · Fair1$300KInterior / Finishes
poor · 1yr past · $300K
LRA Willow Creek
8 systems
$4.09M0.079 · Fair1$1.01MHVAC
poor · 3yr past · $325K
LRA Meadowbrook Elementary
8 systems
$3.82M0.072 · Fair1$275KInterior / Finishes
poor · 0yr past · $275K
LRA Oakmont Elementary
8 systems
$4.11M0.072 · Fair1$295KFire / Life-Safety
poor · 1yr past · $295K
Northstar High - Riverbend
8 systems
$3.73M0.055 · Fair1$695KInterior / Finishes
critical · 5yr past · $205K
LRA Bayside
8 systems
$3.42M0.053 · Fair1$625KInterior / Finishes
critical · 4yr past · $180K
LRA Lakeshore
8 systems
$3.58M0.047 · Good1$170KFire / Life-Safety
poor · 2yr past · $170K
LRA Harborview K8
8 systems
$3.92M0.046 · Good1$435KSite / Parking
poor · 1yr past · $180K
LRA Palmetto Elementary
8 systems
$3.63M0.041 · Good1$150KFire / Life-Safety
poor · 1yr past · $150K
LRA Meadowbrook Middle High
8 systems
$3.95M0.000 · Good—$400KInterior / Finishes
fair · 3yr left · $400K
LRA Sunridge
8 systems
$4.25M0.000 · Good—$425KInterior / Finishes
fair · 2yr left · $425K
LRA Royal Palm
8 systems
$3.94M0.000 · Good—$450KInterior / Finishes
fair · 1yr left · $450K
LRA Gulf Coast
8 systems
$3.88M0.000 · Good—$220KInterior / Finishes
good · 4yr left · $220K
LRA Riverside Heights
8 systems
$3.52M0.000 · Good—$250KInterior / Finishes
fair · 3yr left · $250K
How this connects
Assets & Equipment → the equipment behind these systems.
Preventive Maintenance → extends useful life and defers renewal.
Funding Sources → the Capital Renewal Fund funds this plan.
Budget → where the annual reserve is set aside.
Construction → major renewals become capital projects.